Engine Bay Pictures:
#236
Evolved Member
iTrader: (3)
well finally got around to doing phase two of my engine bay over haul....
heres the before
the mid-way point
the stock harness before
after many hours of removing loom, electical tape and untangling wire runs
Finished harness after 4 days of measuring wire runs, cutting, soldering, relooming, and swearing
teasers untill i can finish the reinstall tomorrow lol
heres the before
the mid-way point
the stock harness before
after many hours of removing loom, electical tape and untangling wire runs
Finished harness after 4 days of measuring wire runs, cutting, soldering, relooming, and swearing
teasers untill i can finish the reinstall tomorrow lol
Last edited by robyn402; Mar 15, 2015 at 11:51 AM.
#239
Evolved Member
iTrader: (3)
Yeah took a few days to do the harness... Definitly not for the faint of heart, I cut feet of wire out of some runs
now I've got a leaking gauge port on my fuel rail to deal with... So said install had been stalled 😢
Seems like your average chunk of metal, welds were solid think I only paid $150 with shipping off eBay lol
now I've got a leaking gauge port on my fuel rail to deal with... So said install had been stalled 😢
Seems like your average chunk of metal, welds were solid think I only paid $150 with shipping off eBay lol
Last edited by robyn402; Mar 18, 2015 at 03:21 PM.